Pipeline Notices — June 2026

586 notices recorded · 24 rated severity 4–5

Every notice, by week

24 notices

The month’s most market-relevant notices, highest severity first. Routine postings (severity 1–3) are on the week pages.

Rockies Express

[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #15

SEV 5/5
Compressor Issue 1.096 Bcf/d Until Further Notice

Rockies Express Pipeline has restricted capacity on Segment 250 (West to East direction) to 1.096 Bcf/d at Bertrand Compressor Station effective Gas Day July 1, 2026, until further notice. This is Update #15, indicating an ongoing unresolved operational issue. Primary firm, secondary firm, and interruptible/AOR service are all at risk of not being scheduled, meaning firm curtailments are actively in play with no restoration timeline.

REX Segment 250 restriction to 1.096 Bcf/d with primary and secondary firm service at risk signals active firm curtailments on a major Rockies-to-Midcontinent corridor with no end date; expect bullish pressure at downstream REX Zone 3 and Midcontinent delivery points and bearish pressure at Rockies basin hubs (CIG/Opal) as eastbound takeaway is constrained.
Reroute: None: Trailblazer Pipeline leases capacity at Bertrand Compressor Station on REX -- when REX Segment 250 is constrained at Bertrand, Trailblazer is simultaneously affected and cannot serve as an independent reroute. No viable alternative exists for full Rockies-to-Midcontinent eastbound reroute.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [FORCE MAJEURE] HEREFORD COMPRESSOR STATION FORCE MAJEURE

SEV 5/5
Force Majeure 0.021 Bcf/d Until Further Notice

Trailblazer Pipeline (TPC) declared a force majeure at its Hereford Compressor Station effective Gas Day June 19, 2026, ID2 cycle, and continuing until further notice. Operating capacity at Location 60361 is restricted to 20.9 MDth/d (approximately 0.021 Bcf/d), an extreme reduction from normal throughput. Primary firm, secondary firm, and interruptible service are all at risk of curtailment.

Trailblazer FM at Hereford CS cuts operating capacity to just 0.021 Bcf/d with no restoration timeline; primary and secondary firm service at risk -- expect bearish pressure on Rockies basis at CIG/Cheyenne Hub as eastbound Rockies takeaway collapses, with reroute to REX potentially compromised given shared infrastructure at Bertrand CS.
Reroute: None: Trailblazer leases capacity at Bertrand Compressor Station on REX -- when Trailblazer is constrained at a shared facility, REX Zone 1 is simultaneously affected and does not represent an independent reroute; CIG provides limited partial alternative for some Rockies volumes but cannot absorb a full Trailblazer outage.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #14

SEV 5/5
Compressor Issue 0.808 Bcf/d Until Further Notice

Trailblazer Pipeline Segment 20 remains restricted to 0.808 Bcf/d effective Gas Day June 2, 2026, until further notice due to an ongoing third-party operational issue at Bertrand Compressor Station -- now in its 14th update. Primary firm, secondary firm, and ITS/AOR quantities are all explicitly at risk of not being scheduled. No restoration timeline has been provided.

Bertrand CS constraint caps Trailblazer at 0.808 Bcf/d with firm service at risk; because REX leases capacity at the same Bertrand CS facility, these two Rockies eastbound pipes are simultaneously constrained -- expect continued bearish pressure on Rockies basin (CIG/Cheyenne Hub) as eastbound takeaway remains impaired with no reroute.
Reroute: None: Trailblazer and REX share the Bertrand Compressor Station -- the same third-party facility constraining Trailblazer simultaneously affects REX Zone 1, eliminating the primary reroute alternative for Rockies eastbound volumes.
View original notice text
Loading…
Rockies Express

[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #14

SEV 5/5
Compressor Issue 1.115 Bcf/d Until Further Notice

Rockies Express Bertrand Compressor Station operational issue (Update #14) restricts Segment 250 West-to-East capacity to 1.115 Bcf/d effective Gas Day June 2, 2026, until further notice. Primary firm, secondary firm, and interruptible service are all at risk of not being scheduled. No restoration timeline has been provided.

REX Segment 250 constrained to 1.115 Bcf/d W-to-E with primary and secondary firm at risk; Trailblazer shares Bertrand CS and is simultaneously affected -- expect bullish pressure at Midcontinent and Chicago Citygate as Rockies takeaway is curtailed with zero independent reroute.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both are simultaneously constrained by the same facility, leaving no independent reroute for Rockies eastbound volumes. CIG provides limited alternative egress but cannot absorb full displaced volumes.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #15

SEV 4/5
Capacity Constraint 0.815 Bcf/d Until Further Notice

Trailblazer Pipeline Segment 20 is restricted to 0.815 Bcf/d effective Gas Day July 1, 2026, until further notice due to a third-party operational issue at Bertrand Compressor Station. This is Update #15, indicating an ongoing multi-week constraint with no restoration timeline. Primary firm, secondary firm, and interruptible service are all at risk of curtailment.

Trailblazer Segment 20 capped at 0.815 Bcf/d with firm service at curtailment risk; because Trailblazer leases capacity at Bertrand CS on REX, this constraint simultaneously limits REX Zone 1 eastbound egress -- expect bearish pressure on Rockies and Midcontinent basis with no independent reroute available.
Reroute: None: Trailblazer leases capacity at Bertrand Compressor Station on REX, meaning REX Zone 1 is simultaneously constrained by the same third-party facility -- these are not independent reroute options. CIG provides limited alternative Rockies egress but cannot fully absorb stranded volumes.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC System Wide Pack - Update #1

SEV 4/5
Operational Alert Until Further Notice 2 Days

EPNG has issued a system-wide Operational Flow Order (OFO) for line pack management, effective 06/30/2026 at 7:19 AM through 07/01/2026 at 9:00 AM. This is a system-wide pack OFO, meaning EPNG is requiring shippers to help maintain adequate line pressure across the entire system. No specific capacity volume restriction is stated in the notice.

EPNG system-wide pack OFO signals operational stress across the full Permian-to-California corridor; expect bearish pressure at Waha as gas cannot freely flow west, with offsetting bullish pressure at SoCal Border and Arizona delivery points where westbound supply is tightened.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some diverted volumes, though a system-wide EPNG OFO typically reflects broad operational stress that TW alone cannot fully offset.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Initial Force Majeure-Florida C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Florida C Station effective 06/29/2026 at 11:21 AM, with an expected restoration by 06/30/2026 at 9:00 AM. Florida C is an internal EPNG tariff segment/compressor station designation in the Southwest/Texas-New Mexico corridor serving Permian outbound flows westward toward SoCal and Arizona -- not the state of Florida. No specific capacity volume was stated in the notice. Duration is approximately 22 hours.

EPNG force majeure at Florida C Station restricts Permian/Waha westbound takeaway; expect bearish pressure at Waha basis as gas backs up in the basin and bullish pressure at SoCal Border and Arizona delivery points as downstream supply tightens -- watch for basis widening on both ends through June 30 morning restoration.
Reroute: Moderate: Transwestern Pipeline (TW) serves the same SoCal border and Arizona delivery markets and may absorb displaced volumes, but TW spare capacity is variable and may not fully offset EPNG Florida C throughput loss. Simultaneous TW constraint would eliminate California reroute entirely.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Pack

SEV 4/5
Operational Alert Until Further Notice 2 Days

EPNG has declared an Operational Flow Order (OFO) for a System-Wide Pack condition, effective immediately as of 06/29/2026 07:33 AM and running through 06/30/2026 09:00 AM. This is a fresh, first-revision notice indicating EPNG is requiring shippers to pack the system -- injecting more gas than is being withdrawn -- to restore system line pack across the entire pipeline. No specific capacity volume is stated, but a system-wide OFO on EPNG indicates significant operational stress across the full Permian-to-California corridor.

EPNG system-wide pack OFO signals immediate operational tightness on the full mainline corridor; expect bearish pressure at Waha as shippers are required to over-deliver into the system, with bullish pressure at SoCal Border and Arizona delivery points where supply availability is constrained.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some volumes, but a system-wide EPNG OFO suggests broad infrastructure stress that TW alone is unlikely to fully offset.
View original notice text
Loading…
Sea Robin Pipeline

[Sea Robin Pipeline] [Maint] Sea Robin East – Liquids Handling Constraints

SEV 4/5
Capacity Constraint Until Further Notice

Sea Robin East producers have been ordered to shut in effective immediately on June 26, 2026, due to third-party downstream liquids handling constraints. All nominations have been cut to EPSQ for Intraday 2 on Gas Day June 26, with no further nominations accepted until liquids handling stabilizes. No restoration timeline has been provided -- the shut-in is until further notice.

Sea Robin East full producer shut-in removes an indeterminate volume of offshore Gulf of Mexico gas supply with no restoration timeline, applying mild bullish pressure to Henry Hub and Gulf Coast onshore spot prices until offshore volumes are restored.
Reroute: None: Sea Robin East is an offshore gathering pipeline -- shut-in production at the platform level has no reroute alternative; the gas cannot move until the downstream third-party liquids handling constraint is resolved.
View original notice text
Loading…
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Alto FMJ

SEV 4/5
Force Majeure 2 Days

Gulf Run Transmission has declared Force Majeure for unplanned maintenance at its Alto Compressor Station in Richland Parish, Louisiana (Zone 1), effective June 30, 2026 at 21:00 through July 1, 2026 at 09:00. During this window, Gulf Run will be unable to deliver to the CGT GR interconnect (#13548) and anticipates impacts to primary firm services. No specific capacity volume was stated in the notice.

Force majeure at Gulf Run Alto CS eliminates deliveries to the CGT GR interconnect (#13548) for approximately 2 days, interrupting primary firm service on a key Haynesville-to-CGT backhaul path; expect tightening at Transco Zone 4 and CGT downstream basis with mild bearish pressure at Haynesville in-basin prices as takeaway is reduced.
Reroute: Moderate: Gulf South Pipeline and Kinder Morgan assets serve overlapping Haynesville corridors and may absorb some diverted volumes, but the specific CGT GR interconnect has no direct bypass, and firm curtailments on primary service limit full offset.
View original notice text
Loading…
TransColorado Gas Transmission

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

TransColorado Gas Transmission has declared a force majeure at Compressor Station 341 (CS341), Unit 4, effective June 16, 2026 with a stated end date of June 30, 2026 at 9:00 AM. The event involves remediation work at the compressor station, suggesting an equipment failure or environmental issue requiring corrective action. No specific capacity volume is stated in the notice, but CS341 is a key compression point on the TransColorado system moving Rocky Mountain gas southward toward the San Juan Basin and downstream markets.

TransColorado CS341 force majeure reduces southbound Rocky Mountain takeaway capacity; expect bearish pressure on upstream Rockies/San Juan Basin basis with potential mild bullish signal at downstream SoCal and Arizona delivery points depending on unutilized EPNG and TW capacity.
Reroute: Limited: TransColorado moves Rocky Mountain (San Juan Basin and Colorado) gas southward connecting to El Paso Natural Gas (EPNG) and Transwestern (TW); reroute options depend on available capacity on those systems, but during summer shoulder season spare capacity may exist on EPNG and TW to partially absorb displaced volumes.
View original notice text
Loading…
Mojave Pipeline

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

Mojave Pipeline has declared a force majeure at Compressor Station 341, Unit 4 (CS341-UP4), effective June 16, 2026, with remediation ongoing through June 30, 2026. The event affects downstream Southern California delivery capacity served by Mojave. No specific volume restriction is stated in the notice.

Mojave FM at CS341 removes compressor capacity on a key SoCal delivery pipeline; expect bullish pressure at SoCal Citygate as downstream California supply tightens, with no volume figure available to quantify the basis impact precisely.
Reroute: Limited: Mojave serves specific Southern California markets downstream of EPNG and Transwestern; while EPNG and TW serve the broader SoCal border, Mojave's downstream local distribution points have limited bypass options and reroute cannot fully offset the CS341 compression loss.
View original notice text
Loading…
Freeport LNG Feed

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

Freeport LNG has declared a force majeure on compressor station CS341, Unit 4 (UP4), effective June 16, 2026, with a stated end date of June 30, 2026. The event affects feed gas delivery to Freeport LNG, reducing the volume of gas being exported and stranding supply in the domestic market. No specific capacity volume is stated in the notice.

Force majeure at Freeport LNG CS341-UP4 curtails LNG feed gas export capacity; gas that cannot be exported remains in the domestic market, applying bearish pressure on Henry Hub and Gulf Coast spot prices until at least June 30.
Reroute: None: gas that cannot be exported as LNG has no equivalent alternative export outlet; curtailed feed gas volumes return to the domestic pipeline system, adding supply rather than reducing it.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Initial Force Majeure - Eunice C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Eunice C Compressor Station effective 06/24/2026 at 7:04 AM, with an expected end date of 06/25/2026 at 9:00 AM. Eunice C Station is located in the Permian Basin corridor in southeastern New Mexico, a key compression point on EPNG's outbound mainline moving gas westward from Waha toward SoCal and Arizona delivery points. No specific capacity volume is stated in the notice. Duration is approximately one day.

EPNG force majeure at Eunice C Station constrains Permian takeaway westbound; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- monitor for capacity restoration by 09:00 AM 06/25.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal border and Arizona delivery points from the Permian/San Juan Basin and can absorb some diverted volumes, but may lack sufficient spare capacity to fully offset an EPNG mainline compressor force majeure. Simultaneous TW constraint would eliminate California reroute entirely.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE - REMEDIATION - CS341-UPD5

SEV 4/5
Force Majeure Until Further Notice 1 Days

NGPL has declared a force majeure at Compressor Station 341 (CS341), effective June 22, 2026 at 11:24 AM, with restoration expected by June 23, 2026 at 9:00 AM. The notice is a first revision (fresh event) with no capacity volume stated. Duration is approximately one calendar day. CS341 is on the NGPL mainline, a high-throughput Gulf Coast-to-Midwest corridor pipeline.

NGPL force majeure at CS341 restricts northbound Gulf Coast-to-Midwest throughput; expect bearish Henry Hub pressure as Gulf Coast supply backs up and bullish pressure at Chicago Citygate and NGPL Midcontinent basis -- no capacity volume stated so magnitude is uncertain but force majeure classification warrants close monitoring.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, but NGPL is one of the highest-capacity Midwest pipelines and partial offsets are likely insufficient for large displacements.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

EPNG has declared a force majeure at Compressor Station 341 (CS341), Unit 4, effective June 16, 2026 through June 30, 2026. CS341 is located on the EPNG mainline in the Southwest corridor, which handles Permian Basin outbound flows westward toward SoCal and Arizona delivery points. No specific capacity volume is stated in the notice. The event is unplanned and has a defined end date of June 30.

EPNG force majeure at CS341-UP4 reduces Permian outbound compression capacity; expect bearish pressure at Waha as basin gas backs up with no stated volume restriction, and bullish pressure at SoCal Border and Arizona delivery points as westbound supply is reduced.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal Border and Arizona deliveries and may absorb some diverted volumes, but reroute is not guaranteed to fully offset the constraint depending on the compression loss magnitude.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

NGPL has declared a force majeure event affecting Compressor Station 341 (CS341) on the UP4 segment, effective immediately on 06/16/2026 with a stated end date of 06/30/2026. No specific capacity volume is provided in the notice. CS341 is a key compression point on NGPL's Gulf Coast-to-Midwest corridor, and this FM declaration indicates an unplanned equipment failure or emergency condition requiring remediation over approximately 14 days.

NGPL CS341 force majeure on UP4 segment tightens northbound Gulf Coast takeaway capacity, expect bearish pressure at Henry Hub as gas backs up onshore with bullish pressure at Chicago Citygate and NGPL Midcontinent basis; no volume stated but CS341 outages on NGPL can materially affect one of the highest-throughput Midwest corridors.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Chicago/Midwest corridors and may absorb some displaced volumes, but NGPL is very high capacity and a full reroute of all affected volumes is unlikely given typical spare capacity constraints on competing pipes.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS34 -UP3

SEV 4/5
Force Majeure Until Further Notice 1 Days

NGPL has declared a force majeure at Compressor Station 34 (Unit 3) effective June 11, 2026 at 3:21 PM, with restoration targeted for June 12, 2026 at 9:00 AM -- approximately 18 hours of impact. No specific capacity volume is stated in the notice. CS34 is located on NGPL's Gulf Coast-to-Midwest mainline corridor, and the unit outage constrains northbound throughput.

NGPL force majeure at CS34 Unit 3 constrains Gulf Coast-to-Chicago northbound capacity; expect bearish Henry Hub pressure as gas backs up at Gulf Coast origin points and bullish Chicago Citygate and NGPL Midcontinent basis versus Henry Hub for the duration.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Chicago and Midwest markets and may absorb displaced volumes, though NGPL is very high capacity and a compressor outage of unknown magnitude may not be fully offset by alternatives.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] Force Majeure - Caprock Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

El Paso Natural Gas has declared a force majeure at Caprock Station effective June 9, 2026 at 4:39 PM, with an expected restoration by June 10, 2026 at 9:00 AM -- approximately 16 hours of disruption. Caprock Station is a key compressor station on EPNG's system in the Permian Basin / Southeast New Mexico corridor, affecting outbound gas flows from the Permian Basin westward. No specific capacity volume was stated in the notice.

EPNG force majeure at Caprock Station tightens Permian outbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points, though the short ~16-hour window limits sustained market impact.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal Border and Arizona deliveries and may absorb some displaced Permian volumes, but spare capacity availability on TW is uncertain and full offset is unlikely during the outage window.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure capacity constraint at the Guyman Point Group, effective June 8, 2026 at 9:00 AM through June 9, 2026 at 8:59 AM -- approximately one calendar day. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt/delivery cluster on the TW system in the Texas Panhandle/Oklahoma corridor, which serves as a key supply aggregation point feeding westbound flows toward SoCal border and Arizona markets.

TW force majeure at Guyman Point Group reduces westbound takeaway capacity on one of two primary SoCal border pipelines; expect bullish pressure at SoCal Border and Arizona delivery points and bearish pressure at Permian/San Juan Basin origin points, though the short one-day duration limits sustained market impact.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona from overlapping receipt areas, and likely has spare capacity to partially absorb diverted TW volumes. However, if EPNG is simultaneously constrained, California reroute potential drops to none.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure capacity constraint at the Guyman Point Group, effective June 8, 2026 at 9:00 AM through June 9, 2026 at 8:59 AM -- a roughly 24-hour outage window. No specific volume figure is provided in the notice. Guyman is a major receipt/delivery group on TW serving the Oklahoma/Texas Panhandle corridor, with westbound flow implications toward SoCal border and Arizona delivery points.

TW force majeure at Guyman Point Group reduces westbound takeaway capacity for one day; expect bearish pressure at Waha and San Juan Basin receipt points with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the primary reroute alternative but may lack sufficient spare capacity to fully absorb curtailed TW volumes.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona delivery points from the same supply basin; however, if EPNG is also running near capacity, reroute relief will be limited and SoCal Border basis tightening could be material for the duration.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure capacity constraint at the Guyman Point Group, effective June 7, 2026 at 9:00 AM through June 8, 2026 at 8:59 AM -- a roughly 24-hour event. No specific capacity volume is stated in the notice. Guyman is a key receipt/delivery group on Transwestern serving the Oklahoma/Texas Panhandle corridor that feeds westbound flows toward SoCal Border and Arizona delivery points.

TW force majeure at Guyman Point Group removes unquantified westbound takeaway capacity for approximately 1 day; expect bullish pressure at SoCal Border and Arizona delivery points, with mild bearish pressure at upstream Panhandle/Anadarko Basin receipt points -- no volume disclosed so magnitude is uncertain but FM status warrants severity 4.
Reroute: Moderate: EPNG (El Paso Natural Gas) is the primary competing pipeline serving SoCal Border and Arizona markets from the east; however, if EPNG is also capacity-constrained, California supply relief would be severely limited. Guyman Point Group serves the Oklahoma/Texas Panhandle corridor, where EPNG may provide partial alternative westbound capacity.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure at the Guyman Point Group, effective June 7, 2026 at 9:00 AM through June 8, 2026 at 8:59 AM -- a one-day event. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt cluster on Transwestern that pulls Permian and San Juan Basin production westbound toward SoCal Border and Arizona delivery markets.

TW force majeure at Guyman Point Group tightens westbound Permian/San Juan takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points -- no volume stated but reroute depends on available EPNG spare capacity.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline serving SoCal Border and Arizona from the Permian Basin; however, if EPNG is simultaneously constrained or running near capacity, reroute options are effectively none for California-bound volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared Force Majeure at the Guyman Point Group, effective June 6 2026 at 9:00 AM through June 7 2026 at 8:59 AM -- a one-day event. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt cluster on the Transwestern system in the Oklahoma/Texas Panhandle/San Juan Basin corridor, meaning gas cannot move westbound toward SoCal border and Arizona delivery points.

TW force majeure at Guyman Point Group constrains westbound capacity toward SoCal Border and Arizona for approximately one day; expect mild bullish pressure at SoCal Border with corresponding bearish pressure at Guyman/Panhandle receipt-side points -- no capacity figure provided limits sizing of the move.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona delivery points from the Southwest corridor, and likely has some spare capacity to absorb displaced Transwestern volumes for a one-day event. However, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
October 2026
554 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices