CAPACITY REDUCTION Non-Performance at Patterson/Neptune (LOC #505655) - Southeast Area
SEV 5/5
Capacity Constraint0.500 Bcf/dUntil Further Notice
ANR Pipeline has declared a critical capacity restriction effective immediately at the Patterson/Neptune receipt location (LOC #505655) in St. Mary Parish, Louisiana, due to non-performance. Starting 7/23 and until further notice, scheduled capacity is reduced by 0.500 Bcf/d, leaving only 0.100 Bcf/d available at this location. ANR explicitly anticipates Firm Primary, Firm Secondary, and Interruptible curtailments -- all service classes are at risk.
ANR restricts 0.500 Bcf/d at Patterson/Neptune (SE Louisiana) with firm primary curtailments anticipated and no restoration timeline; expect bearish Henry Hub pressure as Gulf Coast northbound takeaway backs up, with potential bullish signal at Midwest/Chicago markets losing this supply.
Reroute: Moderate: TETCO, Trunkline (TGC), and Southern Natural (EGT) serve overlapping Gulf Coast northbound corridors, but the 0.500 Bcf/d reduction at a single receipt point is large relative to typical spare capacity and firm curtailments across all service classes suggest limited ability to absorb volumes at alternative paths without congestion.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Over-Under Performance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/22/26
07/22/26
08/31/26
Subject: Subject: CAPACITY REDUCTION Non-Performance at Patterson/Neptune (LOC #505655) - Southeast Area
Author: Author: T0000758
Notice Text
Effective immediately and until further notice, ANR is restricting capacity due to non-performance at the Patterson/Neptune (LOC #505655) receipt location in ANR’s Southeast Area located in St Mary, Louisiana. Capacity will be restricted as follows:
7/22 (Intraday) - No incremental volumes will be scheduled
7/23 - until further notice - Patterson/Neptune (LOC #505655): 500 MMcf/d (leaving 100 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. ANR is monitoring operations at this location closely and will update this posting as necessary.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ANR Pipeline (TC Energy)
CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
SEV 4/5
Maintenance1.611 Bcf/dUntil Further Notice2 Days
ANR Pipeline has planned maintenance at Eunice Compressor Station in the Southeast Area on 3/18-3/19, resulting in curtailments across eight interconnect locations totaling approximately 1.611 Bcf/d of reduced capacity. Affected locations include major interconnects with TGP (443 MMcf/d reduced to 30 MMcf/d), Sonat/SNG (377 MMcf/d reduced to 110 MMcf/d), Weeks Island/LIG (270 MMcf/d reduced to 40 MMcf/d), and Col Gulf (143 MMcf/d reduced to 0 MMcf/d). ANR explicitly anticipates Firm Primary, Firm Secondary, and Interruptible curtailments, meaning all service classes are at risk.
ANR Eunice CS planned outage removes approximately 1.611 Bcf/d of Southeast Area capacity for 3/18-3/19, with firm primary curtailments explicitly anticipated; expect tightening at Transco Zone 4, SNG/Sonat, and TGP Southeast interconnects, with bullish basis pressure across Gulf Coast-to-Southeast delivery corridors.
Reroute: Limited: the Eunice CS constraint simultaneously affects ANR interconnects with both SNG/Sonat and TGP -- the two primary competing Southeast pipelines -- reducing the ability of shippers to reroute curtailed volumes; TETCO and CGT provide partial Gulf Coast northbound alternatives but are unlikely to absorb the full 1.6 Bcf/d reduction.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 02/20/26
02/20/26
03/20/26
Subject: Subject: CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0000106
Notice Text
ANR has planned maintenance at the Eunice compressor station in the Southeast Area. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
3/18 – 3/19:
Patterson/Trunkline (LOC #40317): 94 MMcf/d (leaving 0 MMcf/d)
Patterson to Col Gulf (LOC #43613): 143 MMcf/d (leaving 0 MMcf/d)
Riverway (To Bridgeline) (LOC #42593): 130 MMcf/d (leaving 40 MMcf/d)
Avalon (LOC #38295): 85 MMcf/d (leaving 25 MMcf/d)
Shadyside/Sonat (Del) (LOC #10369): 377 MMcf/d (leaving 110 MMcf/d)
Shadyside/TGP (Del) (LOC #467240): 443 MMcf/d (leaving 30 MMcf/d)
St. Landry/FL Int (LOC #322625): 69 MMcf/d (leaving 30 MMcf/d)
Weeks ISLA/LIG PL (LOC #233620): 270 MMcf/d (leaving 40 MMcf/d)
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
SEV 4/5
Maintenance0.025 Bcf/dUntil Further Notice5 Days
ANR Pipeline has declared an unplanned maintenance event on the Michigan Leg South at the Joliet NGPL interconnect (LOC #2610), effective intraday 7/8/2026 through 7/12/2026. The full 25 MMcf/d (0.025 Bcf/d) capacity at this location is reduced to zero, with 100% curtailment of Firm Primary service based on both current net shipper nominations and contracted MDQ. ANR is cutting previously scheduled volumes beginning Gas Day 7/8/2026 and will issue reservation charge credits per tariff Section 6.36 if firm capacity cannot be delivered.
Unplanned ANR Michigan Leg South outage eliminates 0.025 Bcf/d at the Joliet NGPL interconnect with 100% firm primary curtailments through 7/12, tightening NGPL Chicago/Midwest receipts from ANR and widening Chicago Citygate basis vs Henry Hub.
Reroute: Moderate: NGPL, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, though the complete elimination of this specific ANR-to-NGPL interconnect point limits direct substitution for shippers relying on this delivery location.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Maintenance
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
07/13/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
Author: Author: T0001027
Notice Text
ANR has unplanned pipeline maintenance in the Michigan Leg South area at Joliet NGPL. As a result, capacity will be reduced as follows:
7/8 (Intraday) – 7/12 Joliet NGPL (LOC #2610): 25 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
ANR will be cutting previously scheduled volumes for Gas Day 7/8/2026. Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule and deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
UPDATED CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
SEV 4/5
Maintenance0.025 Bcf/dUntil Further Notice24 Days
ANR Pipeline has extended unplanned maintenance on the Michigan Leg South at the Joliet NGPL interconnect (LOC #2610) in Will County, Illinois, now running from 7/8 through 7/31 (extended from the prior 7/12 end date). Capacity at Joliet NGPL is reduced to 0 MMcf/d from 25 MMcf/d, a complete elimination of deliveries at this location. ANR explicitly anticipates 100% curtailments of Firm Primary, Firm Secondary, and Interruptible service based on both current nominations and contracted MDQ.
ANR unplanned outage eliminates all 0.025 Bcf/d of Joliet NGPL deliveries through 7/31 with 100% firm primary curtailments confirmed; expect bullish pressure at Chicago Citygate and NGPL Midcontinent basis as this supply point goes fully dark for the remainder of the month.
Reroute: Moderate: NGPL, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volume, though 100% firm primary curtailments at this specific Joliet interconnect point mean affected shippers must actively seek alternative paths and may face higher basis costs.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Maintenance
Notice Stat Desc: Supersede
Prior Notice: 26093019
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/13/26
07/08/26
07/13/26
Subject: Subject: UPDATED CAPACITY REDUCTION Michigan Leg South – Joliet (NGPL)
Author: Author: T0001027
Notice Text
Since the last posting, ANR has extended the unplanned pipeline maintenance in the Michigan Leg South area at Joliet NGPL in Will County, Illinois. As a result, capacity will be reduced as follows:
7/8 – 7/31 (previously 7/12) Joliet NGPL (LOC #2610): 25 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule and deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
SEV 4/5
Maintenance2.265 Bcf/dUntil Further Notice7 Days
ANR Pipeline has planned maintenance at Eunice Compressor Station in Acadia Parish, Louisiana (Southeast Area) from August 4-10, 2026, resulting in firm primary, firm secondary, and interruptible curtailments. Nine delivery and interconnect locations face full or near-full capacity reductions totaling approximately 2.265 Bcf/d of constrained capacity, with Pine Prairie South Del completely shut (0.6 Bcf/d) and major curtailments at Shadyside/Sonat (0.431 Bcf/d to 0.150 remaining) and Shadyside/TGP (0.443 Bcf/d to 0.030 remaining). ANR estimates firm primary impact at 10% of current net nominations and 27% of contracted MDQ.
ANR Eunice CS maintenance removes approximately 2.265 Bcf/d of Southeast Area delivery capacity for 7 days (8/4-8/10), with firm primary curtailments affecting key interconnects to CGT (Columbia Gulf), TGP, Sonat/SNG, and Trunkline; expect bullish pressure at Henry Hub and Transco Zone 4 as Gulf Coast supply access tightens, with widening ANR Southeast-to-Midwest basis.
Reroute: Moderate: TETCO (monitored), Trunkline/TGC (monitored), and Southern Natural/SNG (EGT, monitored) serve overlapping Gulf Coast northbound corridors, but the scale of curtailments across multiple interconnects simultaneously -- including the Patterson/Trunkline and Patterson/Col Gulf links -- significantly limits the ability of alternatives to absorb the full volume; partial reroute possible but not sufficient to fully offset 2.265 Bcf/d of constrained capacity.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/11/26
Subject: Subject: CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0001027
Notice Text
ANR has planned maintenance in the Southeast Area at the Eunice Compressor Station located in Acadia Parish, Louisiana. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/4 – 8/10:
Pine Prairie South Del (LOC #766185): 600 MMcf/d (leaving 0 MMcf/d)
Patterson/Trunkline (LOC #40317): 94 MMcf/d (leaving 0 MMcf/d)
Patterson to Col Gulf (LOC #43613): 143 MMcf/d (leaving 0 MMcf/d)
Riverway (To Bridgeline) (LOC #42593): 130 MMcf/d (leaving 40 MMcf/d)
Avalon (LOC #38295): 85 MMcf/d (leaving 25 MMcf/d)
Shadyside/Sonat (Del) (LOC #10369): 431 MMcf/d (leaving 150 MMcf/d)
Shadyside/TGP (Del) (LOC #467240): 443 MMcf/d (leaving 30 MMcf/d)
St. Landry/FL Int (LOC #322625): 69 MMcf/d (leaving 30 MMcf/d)
Weeks ISLA/LIG PL (LOC #233620): 270 MMcf/d (leaving 40 MMcf/d)
Evangeline Southbound (LOC #FPEVNGSB): 380 MMcf/d (leaving 926 MMcf/d)
Estimated impact to Firm Primary as follows:
10% - Based on the Current Net Shipper Nominations
27% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg South - St. John Eastbound
SEV 4/5
Maintenance0.750 Bcf/dUntil Further Notice5 Days
ANR Pipeline has planned maintenance on the Michigan Leg South segment at St. John Eastbound (LOC #FPSTJNEB) from 8/30 through 9/3/2026. Capacity is reduced by 545 MMcf/d (leaving 780 MMcf/d) on 8/30-8/31, then by 750 MMcf/d (leaving 575 MMcf/d) on 9/1-9/3. ANR explicitly warns of Firm Primary, Firm Secondary, and Interruptible curtailments, with firm primary impact estimated at 10-45% on 8/30-8/31 and 34-59% on 9/1-9/3 based on contracted MDQ.
ANR Michigan Leg South eastbound reduction of up to 0.750 Bcf/d with confirmed firm primary curtailment risk (up to 59% of contracted MDQ on 9/1-9/3) tightens Gulf Coast-to-Midwest flows and is bullish for Chicago Citygate and Midwest basis versus Henry Hub during the affected gas days.
Reroute: Moderate: TETCO, PEPL, and TGT serve overlapping Gulf Coast-to-Midwest corridors, but the scale of firm primary curtailments (up to 59% of contracted MDQ) may exceed available alternative capacity on those systems, particularly during late-August/early-September shoulder demand.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
09/04/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg South - St. John Eastbound
Author: Author: T0000106
Notice Text
ANR has planned pipeline maintenance on the Michigan Leg South area. As a result, capacity will be reduced as follows:
8/30 – 8/31 St. John Eastbound (LOC #FPSTJNEB): 545 MMcf/d (leaving 780 MMcf/d)
9/1 – 9/3 St. John Eastbound (LOC #FPSTJNEB): 750 MMcf/d (leaving 575 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
8/30 – 8/31
10% - Based on the Current Net Shipper Nomintions
45% - Based on the Current Contracted MDQ
9/1 – 9/3
34% - Based on the Current Net Shipper Nomintions
59% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
UPDATED: CAPACITY REDUCTION Michigan Leg North – Rabbit River MS
SEV 4/5
Maintenance0.083 Bcf/dUntil Further Notice40 Days
ANR Pipeline has rescheduled planned maintenance on the Michigan Leg North at Rabbit River Meter Station (Allegan County, MI), shifting the window from 7/30-8/24 to 8/6-9/14. During this 40-day period, capacity at Loc #523093 is reduced to zero from 83 MMcf/d (0.083 Bcf/d), with 100% curtailment of firm primary service expected based on both current nominations and contracted MDQ. This supersedes prior notice 26116014.
ANR removes 0.083 Bcf/d of firm delivery capacity at Rabbit River MS through 9/14, with 100% firm primary curtailment anticipated; expect tightening of Michigan/Midwest local basis and potential shipper displacement into alternative Midwest supply paths for the extended 40-day window.
Reroute: Moderate: ANR serves overlapping Midwest/Michigan markets alongside PEPL, TGT, and TETCO, which may absorb some displaced volumes, though Rabbit River MS serves specific local Allegan County distribution points that may have limited bypass options within the Michigan Leg North segment.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116014
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
09/15/26
Subject: Subject: UPDATED: CAPACITY REDUCTION Michigan Leg North – Rabbit River MS
Author: Author: T0000106
Notice Text
ANR has updated the dates for the maintenance in the Michigan Leg North area at the Rabbit River Meter Station located in Allegan County, Michigan. As a result, capacity will be reduced as follows:
8/6 – 9/14 (previously 7/30 - 8/24) Rabbit River MS (LOC #523093): 83 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please refer to critical notices for any additional capacity impacts.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 03/11/26
03/11/26
03/18/26
Subject: Subject: Notice of Phase 2 Cold Weather Operational Conditions & OFO Watch (Fuel Segment ML-7)
Author: Author: T0000106
Notice Text
Notice of Cold Weather Operational Conditions Phase 2, Effective 3/16/26 - 3/17/26
Effective for gas day 3/16/2026 through end of gas day 3/17/2026, in order to preserve system integrity and to ensure ANR is able to meet scheduled delivery commitments to all of fuel segment ML-7; ANR is, in accordance with the General Terms and Conditions, declaring an "Extreme Condition" as that term is defined in ANR's FERC Gas Tariff §6.1, lowering the Swing Percentage from 10% to 5%.
ANR is requesting, in accordance with §6.6.4 of its FERC Gas Tariff, that all receipt and delivery services, excluding ETS and FTS-3 delivery services, to be at a uniform hourly flow rate over a twenty-four (24) hour period. Rate Schedule FTS-3 shippers are required to be at their contractually agreed upon hourly rate.
All Rate Schedule ETS shippers with an aggregated ETS Delivery Point Group must comply with this posting at the ETS Delivery Point Group level. ETS shippers are restricted to the lower of 1/16th of the respective Delivery Point MDQ, or the contractually agreed upon hourly rate in their Service Agreement at the ETS Delivery Point Group level.
Requests for interruptible and overrun services including ANR's hourly ITS-3 service will be evaluated on a case-by-case basis. Scheduled flows for these interruptible services must also be at a uniform hourly rate over a twenty-four (24) hour period or for ITS-3 service the hourly flow rate will be the rate of the nominated, approved, and scheduled quantity. ANR is also reminding all MBS shippers that volumes not within operating tolerances and not at a uniform hourly flow rate of 1/24th of scheduled nominations will not be permitted.
In addition, ANR is closely monitoring "Unauthorized Overrun" under Rate Schedules FTS-1, FTS-2, FTS-3, FTS-4, FTS-4L, STS, and ETS. Please refer to ANR's FERC Gas Tariff under each rate schedule for further detail and elevated penalties in effect during an "Extreme Condition Situation". Shippers attempting to deliver gas via Unauthorized Overrun may be subject to an "express order to Shipper to cease and desist" and a shipper specific OFO.
ANR reserves the right to revoke any conditionally approved operational flexibility.
Customers requesting short-notice start-up are expected to provide corresponding supply into ANR later in the Gas Day. For customers without the short-notice startup provision in their transportation agreement, requests for a short-notice startup will be evaluated a case-by-case basis.
ANR is NOT declaring an Operational Flow Order (OFO) at this time but is providing Advance Warning to shippers (per §6.8.7 of its FERC Gas Tariff) that this weather event could create the need for ANR to issue an OFO with no additional prior notice to protect system integrity. Actions that may be necessary include, but are not limited to, further curtailing interruptible services, declining to schedule firm secondary nominations, and issuing an offending Shipper specific OFO, or issuing a non-Shipper specific OFO. ANR will continue to monitor system integrity closely and will update the EBB as required.
As a reminder, The Projected Hourly Consumption Forecast (Burn Sheet) for the power plant operations is required to be submitted to ANR prior to any flow or flow changes.
ANR will continue to monitor the system integrity closely and will update this posting as required.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 02/20/26
02/20/26
03/20/26
Subject: Subject: CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance at the Eunice compressor station on Southeast Mainline. As a result, capacity will be reduced as follows:
3/18 – 3/19 Evangeline Southbound (LOC #FPEVNGSB): 350 MMcf/d (leaving 987 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
22% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
08/01/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Shelbyville Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance on the Southeast Mainline at the Shelbyville Compressor Station located in Shelby County, Indiana. As a result, capacity will be reduced as follows:
7/21 – 7/31 Shelbyville Southbound (LOC #FPSHBVSB): 190 MMcf/d (leaving 850 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
16% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26087023
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
07/25/26
Subject: Subject: UPDATED CAPACITY REDUCTION Southwest Area
Author: Author: T0001027
Notice Text
Since the last posting, ANR has updated the dates and capacity impact at Barnitz Creek (LOC #513128) in the Southwest Area in Custer, Oklahoma. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
7/13 – 7/24 EG Hill Northbound (LOC #FPEGHLNB): 19 MMcf/d (leaving 196 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/24 Mooreland Northbound (LOC #FPMORLNB): 18 MMcf/d (leaving 188 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/24 Custer Northbound (LOC #FPCSTRNB): 4 MMcf/d (leaving 36 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
0% - Based on the Current Contracted MDQ
7/13 – 7/17 Red River Interconnect (LOC #185837): 125 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/20 – 7/24 Kizer Creek (LOC #513106): 160 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/21 – 7/23 (previously 7/20 - 7/24) Barnitz Creek (LOC #513128): 86 MMcf/d (leaving 30 MMcf/d) (previously shut in)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
23% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ANR Pipeline (TC Energy)
Assessment of Extreme Condition 7/14/26 – 7/16/26 with Extreme Condition Penalty Waiver
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
08/20/26
Subject: Subject: Assessment of Extreme Condition 7/14/26 – 7/16/26 with Extreme Condition Penalty Waiver
Author: Author: T0001027
Notice Text
Recent extreme weather conditions led ANR Pipeline (ANR) to declare an Extreme Condition Situation (Extreme Condition) as defined in the General Terms and Conditions (GT&C) §6.1 of ANR’s FERC Gas Tariff (Tariff) for 7/14/26 – 7/16/26. The Extreme Condition was applicable in ANR's ML2, ML3, and ML7 zones. In accordance with ANR's Tariff, the Swing Percentage (as defined in ANR's Tariff GT&C §6.1) was lowered from 10% to 5% in those zones during the Extreme Condition.
As part of the Extreme Condition posting, ANR shippers were directed to ensure adequate supply was nominated and simultaneously flowing and maintain a uniform hourly flow unless contractually allowed to use an alternate hourly flow.
ANR carefully monitors and assesses shipper activities during Extreme Condition periods and is pleased to report that shipper compliance strongly contributed to our success in preserving system integrity and meeting scheduled delivery commitments during this Extreme Condition period. We are, as always, grateful for your spirit of teamwork and cooperation.
Accordingly, ANR is waiving its higher Extreme Condition Daily Scheduling Penalties and Unauthorized Overrun Service penalties pursuant to Section 6.18.13 of its Tariff. Extreme Condition penalty rates would have been "the greater of ten dollars ($10.00) or two (2) times the Spot Price Index for the Service Month" as described in ANR's Tariff under applicable rate schedules, subject to allocation rules set in place at each delivery location. This waiver is not an indication of future waivers. Each Extreme Condition will be evaluated independently.
All penalty waivers are posted at www.tceconnects.com, Informational Postings, Other, Penalty Waiver Log.
To clarify, non-critical penalties will apply for the time period above as they do every day across the ANR system. Details on non-critical penalty rates can be found under applicable rate schedules in ANR's Tariff. Please refer to your preliminary invoices or reach out to your ANR Customer Service Representative or Account Coordinator with questions about your specific penalty exposure.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/08/26
Subject: Subject: CAPACITY REDUCTION - Southeast Mainline – Brownsville Southbound
Author: Author: T0000758
Notice Text
ANR has planned pipeline maintenance on the Southeast Mainline at the Brownsville Compressor Station located in Haywood County, Tennessee. As a result, capacity will be reduced as follows:
8/4 – 8/7 - Brownsville Southbound (LOC #FPBRSVSB): 239 MMcf/d (leaving 988 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
17% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/29/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance on the Southeast Mainline at the Madisonville Compressor Station located in Hopkins County, Kentucky. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/11 – 8/12 - Cottage Grove Southbound (LOC #FPCTGGSB): 268 MMcf/d (leaving 965 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
19% - Based on the Current Contracted MDQ
8/14 – 8/28 - Cottage Grove Southbound (LOC #FPCTGGSB): 260 MMcf/d (leaving 972 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
18% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg North – Rabbit River MS
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/22/26
07/22/26
08/25/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg North – Rabbit River MS
Author: Author: T0000106
Notice Text
ANR has planned maintenance in the Michigan Leg North area at the Rabbit River Meter Station located in Allegan County, Michigan. As a result, capacity will be reduced as follows:
7/30 – 8/24 Rabbit River MS (LOC #523093): 83 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please refer to critical notices for any additional capacity impacts.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ANR Pipeline (TC Energy)
UPDATED.CAPACITY REDUCTION Michigan Leg North – Bridgman Northbound
SEV 3/5
Maintenance0.679 Bcf/dUntil Further Notice26 Days
ANR Pipeline has updated planned maintenance at Hamilton Compressor Station in Allegan County, Michigan, shifting the start date to July 30 from July 28 and confirming a 0.679 Bcf/d capacity reduction on the Bridgman Northbound segment (LOC #FPBRGMNB), leaving 0.943 Bcf/d available. The outage runs July 30 through August 24, 2026 (26 days). ANR warns of potential Firm Primary, Firm Secondary, and Interruptible curtailments, estimating up to 35% impact on contracted MDQ though current nominations show 0% firm impact.
ANR Bridgman Northbound reduction of 0.679 Bcf/d through August 24 tightens northbound Gulf Coast-to-Midwest takeaway; watch for mild bearish pressure at Henry Hub and Gulf Coast origin points with modest bullish signal at Michigan/Chicago Citygate basis, though zero current firm nomination impact limits near-term price effect.
Reroute: Moderate: TETCO, Trunkline (TGC), and Panhandle Eastern (PEPL) serve overlapping Gulf Coast-to-Midwest corridors and can absorb some displaced volumes, though a 0.679 Bcf/d reduction is material and may not be fully offset if those pipes are running near capacity in summer.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26069010
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/22/26
07/22/26
08/25/26
Subject: Subject: UPDATED.CAPACITY REDUCTION Michigan Leg North – Bridgman Northbound
Author: Author: T0000106
Notice Text
ANR has updated the start date and capacity impact for the maintenance in the Michigan Leg North area at the Hamilton Compressor Station located in Allegan County, Michigan. As a result, capacity will be reduced as follows:
7/30 (previously 7/28) – 8/24 Bridgman Northbound (LOC #FPBRGMNB): 679 MMcf/d (leaving 943 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
35% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please refer to critical notices for any additional capacity impacts.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26107014
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/23/26
07/23/26
07/28/26
Subject: Subject: UPDATED CAPACITY REDUCTION Southwest Area
Author: Author: T0000106
Notice Text
Since the last posting, ANR has extended the maintenance through 7/27 (previously 7/24) in the Southwest Area in Custer, Oklahoma. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
7/13 – 7/27 EG Hill Northbound (LOC #FPEGHLNB): 19 MMcf/d (leaving 196 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/27 Mooreland Northbound (LOC #FPMORLNB): 18 MMcf/d (leaving 188 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/27 Custer Northbound (LOC #FPCSTRNB): 4 MMcf/d (leaving 36 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
0% - Based on the Current Contracted MDQ
7/20 – 7/27 Kizer Creek (LOC #513106): 160 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/21 – 7/27 Barnitz Creek (LOC #513128): 86 MMcf/d (leaving 30 MMcf/d) (previously shut in)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
23% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/24/26
07/24/26
08/28/26
Subject: Subject: CAPACITY REDUCTION Southwest Area
Author: Author: T0000106
Notice Text
ANR has planned pipeline maintenance in the Southwest Area in Hansford and Wheeler Counties, Texas and Woodward County, Oklahoma. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/3 – 8/12 EG Hill Northbound (LOC #FPEGHLNB): 90 MMcf/d (leaving 125 MMcf/d)
8/13 – 8/27 EG Hill Northbound (LOC #FPEGHLNB): 15 MMcf/d (leaving 200 MMcf/d)
Estimated impact to Firm Primary as follows:
8/3 – 8/12:
25% - Based on the Current Net Shipper Nominations
40% - Based on the Current Contracted MDQ
8/13 – 8/27:
0% - Based on the Current Net Shipper Nominations
3% - Based on the Current Contracted MDQ
8/3 – 8/12 Mooreland Northbound (LOC #FPMORLNB): 87 MMcf/d (leaving 119 MMcf/d)
8/13 – 8/27 Mooreland Northbound (LOC #FPMORLNB): 15 MMcf/d (leaving 191 MMcf/d)
Estimated impact to Firm Primary as follows:
8/3 – 8/12:
0% - Based on the Current Net Shipper Nominations
40% - Based on the Current Contracted MDQ
8/13 – 8/27:
0% - Based on the Current Net Shipper Nominations
4% - Based on the Current Contracted MDQ
8/3 – 8/12 Custer Northbound (LOC #FPCSTRNB): 20 MMcf/d (leaving 20 MMcf/d)
8/13 – 8/27 Custer Northbound (LOC #FPCSTRNB): 4 MMcf/d (leaving 36 MMcf/d)
Estimated impact to Firm Primary as follows:
8/3 – 8/12:
0% - Based on the Current Net Shipper Nominations
31% - Based on the Current Contracted MDQ
8/13 – 8/27:
0% - Based on the Current Net Shipper Nominations
0% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/24/26
07/24/26
08/25/26
Subject: Subject: CAPACITY REDUCTION Southwest Mainline Northbound
Author: Author: T0000106
Notice Text
ANR has planned pipeline maintenance on the Southwest Mainline. As a result, capacity will be reduced as follows:
8/13 – 8/24 Southwest Mainline Northbound (LOC #FPSWMLNB): 226 MMcf/d (leaving 480 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
30% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg South – Crown Point MS
SEV 3/5
Maintenance0.326 Bcf/dUntil Further Notice5 Days
ANR Pipeline has planned maintenance at Crown Point Meter Station (LOC #138744) in Lake County, Indiana on the Michigan Leg South from August 17-21, 2026. The outage eliminates the full 326 MMcf/d of capacity at this location, leaving 0 MMcf/d available for the 5-day window. ANR explicitly anticipates Firm Secondary and Interruptible curtailments as a result.
ANR Michigan Leg South loses 0.326 Bcf/d at Crown Point MS for five days (8/17-8/21), with firm secondary and interruptible curtailments expected; watch for tightening Chicago Citygate and Midwest basis as Gulf Coast northbound ANR throughput is constrained, with partial reroute pressure onto TETCO and PEPL.
Reroute: Moderate: TETCO, Panhandle Eastern (PEPL), and Trunkline (TGC) serve overlapping Gulf Coast-to-Midwest corridors and can absorb some diverted volumes, though simultaneous summer demand may limit available spare capacity on these alternatives.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
08/22/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg South – Crown Point MS
Author: Author: T0000106
Notice Text
ANR has planned pipeline maintenance in the Michigan Leg South area at Crown Point MS (LOC ID#138744) located in Lake County, Indiana. As a result, capacity will be reduced as follows:
8/17 – 8/21 Crown Point MS (LOC ID#138744): 326 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Secondary and Interruptible curtailments.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ANR Pipeline (TC Energy)
CAPACITY REDUCTION Michigan Leg South – East Joliet MS
SEV 3/5
Maintenance0.328 Bcf/dUntil Further Notice4 Days
ANR Pipeline has planned maintenance at East Joliet Meter Station (LOC ID#4196) in Will County, IL from August 11-14, 2026. The full 0.328 Bcf/d capacity at this location will be reduced to zero for the four-day window. ANR explicitly anticipates Firm Secondary and Interruptible curtailments as a result.
ANR East Joliet MS goes to zero for 0.328 Bcf/d over Aug 11-14; expect bullish pressure at Chicago Citygate and Midwest basis points as northbound Michigan Leg South deliveries are curtailed, with Firm Secondary and Interruptible shippers at greatest risk.
Reroute: Moderate: TETCO, PEPL, and Southern Star serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, though full replacement of 0.328 Bcf/d at this specific Illinois delivery point is unlikely given localized Michigan Leg South distribution.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
08/15/26
Subject: Subject: CAPACITY REDUCTION Michigan Leg South – East Joliet MS
Author: Author: T0000106
Notice Text
ANR has planned pipeline maintenance in the Michigan Leg South area at East Joliet MS (LOC ID#4196) located in Will County, IL. As a result, capacity will be reduced as follows:
8/11 – 8/14 East Joliet MS (LOC ID#4196): 328 MMcf/d (leaving 0 MMcf/d)
ANR anticipates this posting may result in Firm Secondary and Interruptible curtailments.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
UPDATED.CAPACITY REDUCTION Michigan Leg North – Bridgman Northbound
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116013
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
09/15/26
Subject: Subject: UPDATED.CAPACITY REDUCTION Michigan Leg North – Bridgman Northbound
Author: Author: T0000106
Notice Text
ANR has updated the dates for the maintenance in the Michigan Leg North area at the Hamilton Compressor Station located in Allegan County, Michigan. As a result, capacity will be reduced as follows:
8/6 – 9/14 (previously 7/30 - 8/24) Bridgman Northbound (LOC #FPBRGMNB): 679 MMcf/d (leaving 943 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
35% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please refer to critical notices for any additional capacity impacts.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26092018
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
08/18/26
Subject: Subject: UPDATED: CAPACITY REDUCTION Southeast Mainline – Defiance Westbound
Author: Author: T0000106
Notice Text
ANR has extended the maintenance on the Southeast Mainline located in Defiance County, Ohio. As a result, capacity will be reduced as follows:
7/13 – 8/17 (Previously 8/14) Defiance Westbound (LOC #FPDEFNWB): 195 MMcf/d (leaving 490 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
16% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
UPDATED: CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26108034
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
08/30/26
Subject: Subject: UPDATED: CAPACITY REDUCTION Southeast Mainline – Cottage Grove Southbound
Author: Author: T0000106
Notice Text
ANR has revised the dates for maintenance on the Southeast Mainline at the Madisonville Compressor Station located in Hopkins County, Kentucky. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/11 – 8/12 - Cottage Grove Southbound (LOC #FPCTGGSB): 268 MMcf/d (leaving 965 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
19% - Based on the Current Contracted MDQ
8/17 – 8/29 (Previously 8/14 – 8/28) - Cottage Grove Southbound (LOC #FPCTGGSB): 260 MMcf/d (leaving 972 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
18% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26093020
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
08/11/26
Subject: Subject: UPDATED: CAPACITY REDUCTION Southeast Mainline – Shelbyville Southbound
Author: Author: T0000106
Notice Text
ANR has extended the maintenance on the Southeast Mainline at the Shelbyville Compressor Station located in Shelby County, Indiana. As a result, capacity will be reduced as follows:
7/21 – 8/10 (previously 7/31) Shelbyville Southbound (LOC #FPSHBVSB): 190 MMcf/d (leaving 850 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
16% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 25980321
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 03/18/26
03/18/26
03/19/26
Subject: Subject: UPDATED CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound
Author: Author: T0000106
Notice Text
Effective 3/18/26 ID3 cycle, ANR has completed the Eunice compressor station maintenance and is reinstating capacity at Evangeline Southbound (LOC #FPEVNGSB) to 1,087 MMcf/d (previously 987 MMcf/d).
Please refer to Notice #25986109 on the EBB for additional maintenance.
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
UPDATED CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 25980318
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 03/18/26
03/18/26
03/19/26
Subject: Subject: UPDATED CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0000106
Notice Text
Effective 3/18/26 ID3 cycle, ANR has completed the Eunice compressor station maintenance and is reinstating capacities as follows:
Riverway (To Bridgeline) (LOC #42593): 110 MMcf/d (previously 40 MMcf/d)
St. Landry/FL Int (LOC #322625): 44 MMcf/d (previously 30 MMcf/d)
Weeks ISLA/LIG PL (LOC #233620): 140 MMcf/d (previously 40 MMcf/d)
Please refer to Notice #25986110 on the EBB for additional maintenance.
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
Assessment of Extreme Condition 6/29/26 – 6/30/26 with Extreme Condition Penalty Waiver
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/07/26
07/07/26
08/07/26
Subject: Subject: Assessment of Extreme Condition 6/29/26 – 6/30/26 with Extreme Condition Penalty Waiver
Author: Author: T0001027
Notice Text
Recent extreme weather conditions led ANR Pipeline (ANR) to declare an Extreme Condition Situation (Extreme Condition) as defined in the General Terms and Conditions (GT&C) §6.1 of ANR’s FERC Gas Tariff (Tariff) for 6/29/26 – 6/30/26. The Extreme Condition was applicable in ANR's ML2, ML3, and ML7 zones. In accordance with ANR's Tariff, the Swing Percentage (as defined in ANR's Tariff GT&C §6.1) was lowered from 10% to 5% in those zones during the Extreme Condition.
As part of the Extreme Condition posting, ANR shippers were directed to ensure adequate supply was nominated and simultaneously flowing and maintain a uniform hourly flow unless contractually allowed to use an alternate hourly flow.
ANR carefully monitors and assesses shipper activities during Extreme Condition periods and is pleased to report that shipper compliance strongly contributed to our success in preserving system integrity and meeting scheduled delivery commitments during this Extreme Condition period. We are, as always, grateful for your spirit of teamwork and cooperation.
Accordingly, ANR is waiving its higher Extreme Condition Daily Scheduling Penalties and Unauthorized Overrun Service penalties pursuant to Section 6.18.13 of its Tariff. Extreme Condition penalty rates would have been "the greater of ten dollars ($10.00) or two (2) times the Spot Price Index for the Service Month" as described in ANR's Tariff under applicable rate schedules, subject to allocation rules set in place at each delivery location. This waiver is not an indication of future waivers. Each Extreme Condition will be evaluated independently.
All penalty waivers are posted at www.tceconnects.com, Informational Postings, Other, Penalty Waiver Log.
To clarify, non-critical penalties will apply for the time period above as they do every day across the ANR system. Details on non-critical penalty rates can be found under applicable rate schedules in ANR's Tariff. Please refer to your preliminary invoices or reach out to your ANR Customer Service Representative or Account Coordinator with questions about your specific penalty exposure.
ANR Pipeline (TC Energy)
Notice of Phase 1 Warm Weather Operational Conditions (Posted: 7/8/26)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/08/26
07/08/26
07/18/26
Subject: Subject: Notice of Phase 1 Warm Weather Operational Conditions (Posted: 7/8/26)
Author: Author: T0001375
Notice Text
Notice of Warm Weather Operational Conditions Phase 1, Effective 7/11/2026 – 7/17/2026
Due to projected warm weather forecasts, expected operational conditions and nomination levels, it is increasingly important that ANRPL shippers maintain sufficient receipt and delivery volumes to minimize imbalances and ensure system integrity. ANR Pipeline will continue to monitor pipeline operations and the weather forecasts.
Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26093016
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/20/26
07/20/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/20/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260720.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/21/26
07/21/26
08/22/26
Subject: Subject: CAPACITY REDUCTION Southeast Mainline – Delhi Southbound
Author: Author: T0001375
Notice Text
ANR has planned maintenance on the Southeast Mainline located in Richland Parish, Louisiana. As a result, capacity will be reduced as follows:
8/10 – 8/21 Delhi Southbound (LOC #FPDELHSB): 150 MMcf/d (leaving 1,064 MMcf/d)
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
10% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26107015
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/22/26
07/22/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/22/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260721.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116008
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/23/26
07/23/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/23/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260723.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116015
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/24/26
07/24/26
07/25/26
Subject: Subject: UPDATED CAPACITY REDUCTION Southwest Area
Author: Author: T0000106
Notice Text
Effective Timely Cycle for Gas Day 7/25, ANR has completed the maintenance and reinstating the following capacities:
EG Hill Northbound (LOC #FPEGHLNB): Available Capacity is 215 MMcf/d
Mooreland Northbound (LOC #FPMORLNB): Available Capacity is 206 MMcf/d
Custer Northbound (LOC #FPCSTRNB): Available Capacity is 40 MMcf/d
Kizer Creek (LOC #513106): Available Capacity is 160 MMcf/d
Barnitz Creek (LOC #513128): Available Capacity is 116 MMcf/d
****Previous Posting****
Since the last posting, ANR has extended the maintenance through 7/27 (previously 7/24) in the Southwest Area in Custer, Oklahoma. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
7/13 – 7/27 EG Hill Northbound (LOC #FPEGHLNB): 19 MMcf/d (leaving 196 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/27 Mooreland Northbound (LOC #FPMORLNB): 18 MMcf/d (leaving 188 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
5% - Based on the Current Contracted MDQ
7/13 – 7/27 Custer Northbound (LOC #FPCSTRNB): 4 MMcf/d (leaving 36 MMcf/d)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
0% - Based on the Current Contracted MDQ
7/20 – 7/27 Kizer Creek (LOC #513106): 160 MMcf/d (leaving 0 MMcf/d)
Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
7/21 – 7/27 Barnitz Creek (LOC #513128): 86 MMcf/d (leaving 30 MMcf/d) (previously shut in)
Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
23% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116016
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/24/26
07/24/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/24/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260724.pdf
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Supersede
Prior Notice: 26116023
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/26/26
07/25/26
08/25/26
Subject: Subject: Updated: ICE Measurement Application Access Issue
Author: Author: T0001027
Notice Text
Since the last posting, the system has been restored and ICE is now available.
***Previous posting***
TC Energy is currently experiencing issues preventing users from accessing ICE Measurement. Our support team is closely monitoring the situation and will share updates as more information becomes available.
As an alternative for accessing measurement data, customers may use the following measurement screens in TC eConnects.
Location Vol/Qty
Meter Vol/Qty
Instructions on how to retrieve measurement information are available on the TC eConnects EBB under the ANRPL Training link: Measurement on TC eConnects.
These TC eConnects screens will remain the recommended source for measurement information until further notice.
For questions, please contact your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline at 800-827-5267.
ANR Pipeline (TC Energy)
LIFTED: NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Force Majeure
Notice Stat Desc: Supersede
Prior Notice: 26117020
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/27/26
07/27/26
07/28/26
Subject: Subject: LIFTED: NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
Author: Author: T0000106
Notice Text
Effective immediately, ANR has completed repairs for the Fallen Timbers Meter Station (LOC#523086) and is reinstating capacity to 255 MMcf/d.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
LIFTED CAPACITY REDUCTION Non-Performance at Patterson/Neptune (LOC #505655) - Southeast Area
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Over-Under Performance
Notice Stat Desc: Supersede
Prior Notice: 26117010
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
07/29/26
Subject: Subject: LIFTED CAPACITY REDUCTION Non-Performance at Patterson/Neptune (LOC #505655) - Southeast Area
Author: Author: T0000758
Notice Text
LIFTED CAPACITY REDUCTION Non-Performance at Patterson/Neptune (LOC #505655) - Southeast Area
Effective immediately, ANR is lifting the restriction at the Patterson/Neptune (LOC #505655) receipt location in ANR’s Southeast Area located in St Mary, Louisiana. As a result, ANR is reinstating capacity to 600 MMcf/d.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage
Notice Stat Desc: Supersede
Prior Notice: 26116021
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/28/26
07/28/26
11/01/26
Subject: Subject: MAINTENANCE SCHEDULE for ANR Pipeline
Author: Author: T0000106
Notice Text
ANR Pipeline Maintenance Schedule has been updated as of 7/28/26
Please refer to the Maintenance Schedule found on the ANR Informational Postings under Construction and Maintenance.
Please note that the information posted is proposed and subject to change.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Additionally, the following file(s) can be located on Informational Postings under Construction and Maintenance
2026 ANRPL System Planned Maintenance Schedule 20260728.pdf
ANR Pipeline (TC Energy)
ICE Measurement Application Access Issue
SEV 1/5
Informational
Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.
Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Customer Services Update
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/25/26
07/25/26
08/25/26
Subject: Subject: ICE Measurement Application Access Issue
Author: Author: T0001027
Notice Text
TC Energy is currently experiencing issues preventing users from accessing ICE Measurement. Our support team is closely monitoring the situation and will share updates as more information becomes available.
As an alternative for accessing measurement data, customers may use the following measurement screens in TC eConnects.
Location Vol/Qty
Meter Vol/Qty
Instructions on how to retrieve measurement information are available on the TC eConnects EBB under the ANRPL Training link: Measurement on TC eConnects.
These TC eConnects screens will remain the recommended source for measurement information until further notice.
For questions, please contact your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline at 800-827-5267.
ANR Pipeline (TC Energy)
NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
SEV 1/5
Informational
Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.
Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Force Majeure
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/25/26
07/25/26
08/05/26
Subject: Subject: NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
Author: Author: T0001375
Notice Text
This is to notify all contracted parties of ANR Pipeline Company ("ANR") that pursuant to Section 6.7 of ANR's FERC Gas Tariff, ANR has declared a Force Majeure event in effect for natural gas transactions in the Michigan Leg South area due to unexpected and uncontrollable repairs to damaged equipment or machinery at Fallen Timbers (LOC#523086) located in Lucas County, Ohio. As a result, capacity will be reduced as follows:
7/25 (Intraday) - No incremental volumes will be scheduled
7/26 – 8/4 – Fallen Timbers (LOC#523086): Shut in to 0 MMcf/d
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR's FERC Gas Tariff ("Tariff"). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Force Majeure Average Usage Quantity, as defined in Section 6.36.2(a) of ANR's Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper's 7-day Force Majeure Average Usage Quantity pursuant to Section 6.36.2(a) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)
Updated: NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
SEV 1/5
Informational
Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.
Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Force Majeure
Notice Stat Desc: Supersede
Prior Notice: 26117019
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
Post Date: 07/25/26
07/25/26
08/05/26
Subject: Subject: Updated: NOTICE OF FORCE MAJEURE ANRPL – Michigan Leg South – Fallen Timbers (LOC#523086)
Author: Author: T0001375
Notice Text
Since the last posting, ANR will now be curtailing previously scheduled volumes for Gas Day 7/25/2026.
7/25 (Intraday) - to EPSQ
7/26 – 8/4 – Fallen Timbers (LOC#523086): Shut in to 0 MMcf/d
****Previous Posting****
This is to notify all contracted parties of ANR Pipeline Company ("ANR") that pursuant to Section 6.7 of ANR's FERC Gas Tariff, ANR has declared a Force Majeure event in effect for natural gas transactions in the Michigan Leg South area due to unexpected and uncontrollable repairs to damaged equipment or machinery at Fallen Timbers (LOC#523086) located in Lucas County, Ohio. As a result, capacity will be reduced as follows:
7/25 (Intraday) - No incremental volumes will be scheduled
7/26 – 8/4 – Fallen Timbers (LOC#523086): Shut in to 0 MMcf/d
ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
100% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR's FERC Gas Tariff ("Tariff"). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Force Majeure Average Usage Quantity, as defined in Section 6.36.2(a) of ANR's Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper's 7-day Force Majeure Average Usage Quantity pursuant to Section 6.36.2(a) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267