Free: this page refreshes several times a day (delayed) — email & Telegram alerts on a 1-hour delay, severity 4–5 only.
Pro ($149/mo): Real-time alerts within ~2 minutes of posting, full AI trading note. See plans →
All
Force Majeure
Maintenance
Capacity
Compressor
Sev 4–5 Only
Every active notice for Tennessee Gas Pipeline, newest first.
← Back to the Tennessee Gas Pipeline summary
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 860 BH EFF 10-28
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESULTS OS #1440
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESULTS OS #1441
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 560-2 to MLV 563-2 Pipe Replacement
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1442
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 325-1 to MLV 329-1 Pig runs - EMAT
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESULTS OS #1439
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY - OS #1441
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1440
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE MLV 313 (HC LINE) RESOLVED
SEV 1/5
lifted ✓
Restoration
10 Days
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on the HC Line between valve sections MLV 313A-403 and 313A-404 just south of Avoca, New York (Segment 399 FH, Zone 4 End). Repairs to the discovered anomaly are complete and the area is returning to normal operations effective Timely Cycle for gas day October 16, 2026. Meters 412803 TGP Gravel Run and 421068 TGP Wyckoff Storage will also accept nominations up to meter capacity; this is the final update for the outage.
TGP HC Line force majeure south of Avoca, NY is fully resolved as of October 16 gas day Timely Cycle -- no capacity constraint remains and any Zone 4 Northeast basis premium attributable to this event should unwind.
Reroute: High: constraint is resolved; no reroute analysis required. Prior to resolution, limited reroute existed given TGP and Transco are the two dominant Northeast pipes, but that is now moot.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP RESTR SEG 399FH EFF 10-16
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 560-2 to MLV 563-2 Pipe Replacement
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS 219 LIFTED EFF 10-15-26
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
METERS HELD TO EPSQ EFFECTIVE 10-14-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1439
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESULTS - OS #1438
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCEMAJEURE MUSKRAT LINE RESOLVED 10-11
SEV 2/5
lifted ✓
Restoration
2 Days
TGP is posting resolution of the force majeure declared on its Muskrat Line (Segments 509, 515, 516, 523, 524) effective October 9, 2026, which was triggered by Hurricane Isaias evacuations at the Cocodrie, Louisiana area facilities. Personnel have returned and operations are returning to normal, with full nominations scheduled to restore effective the Timely Cycle for Gas Day October 11, 2026. This is the final update for this outage; the constraint lasted approximately two gas days.
TGP Muskrat Line force majeure resolved; full scheduling through Segment 524 FH resumes October 11 Timely Cycle, removing any residual bullish pressure on Gulf Coast and Southeast TGP basis points -- no new market impact from this notice.
Reroute: Moderate: Tennessee Gas Pipeline overlaps with SNG (unmonitored), Transco, and ANR in Gulf Coast and Southeast corridors, though the Muskrat Line serves specific offshore/Cocodrie-area receipt points with limited direct bypass. Moot given the restoration.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP RESTR MUSKRAT EFF 10-11
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 73-1 to MLV 74-1: Anomaly Remediatio
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEV 4/5
Force Majeure
Until Further Notice
Tennessee Gas Pipeline has declared a force majeure on its Muskrat Line (Segments 509, 515, 516, 523, and 524) effective Gas Day October 9, 2026 and until further notice, due to evacuations in the Cocodrie, Louisiana area driven by the projected path and landfall of Hurricane Isaias. Primary In the Path capacity at Segment 524 FH may be impacted as early as the Timely Cycle for October 9. No specific capacity volume is stated; duration is indeterminate (UFN).
TGP Muskrat Line force majeure effective 10-9-26 UFN removes Gulf Coast zone supply with no stated capacity figure but hurricane-driven evacuations at Cocodrie create immediate risk to primary firm service on Segments 509-524; expect bullish pressure on Tennessee Zone 0/1 downstream basis and potential widening at Transco Zone 4 as Gulf Coast TGP supply is at risk.
Reroute: Limited: Gulf South (monitored) and Columbia Gulf Transmission serve overlapping Gulf Coast corridors, but hurricane evacuation conditions affecting the Cocodrie area may simultaneously constrain other Gulf Coast infrastructure; reroute cannot be assumed reliable while Isaias threatens landfall.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 524 FH EFF 10-9-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FGT CARNES DEL RESTRICTION LIFTED 10-9
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
535-2 to 536-2 SCCDA
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TROPICAL STORM ISAIAS TRACKING 10-7-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE SEG 490FH RESOLVED 10-7
SEV 1/5
lifted ✓
Restoration
1 Days
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on Line 1 between STA 409A-101 and MLV 409A-103 (Segment 490FH) near the Alamo Compressor Station in Hidalgo County, TX. The Rio Bravo Delivery Meter (421017) and the Cenagas Delivery Meter (450261) were shut in during pipeline repairs identified during pig runs September 22-25, 2026; repairs are now complete. Nominations will resume scheduling up to posted segment and meter capacity effective Intraday Cycle 1 for Gas Day October 7, 2026, and this is the final update for the outage.
TGP Segment 490FH force majeure fully resolved as of ID1 October 7, 2026 -- Rio Bravo and Cenagas export delivery meters returning to normal capacity with no residual constraint; no new market impact.
Reroute: High: force majeure is resolved and no reroute is required; South Texas delivery and Mexico export flows via Rio Bravo and Cenagas meters are restored to normal scheduled quantities.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP RESTR SEG 490FH EFF 10-8
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SUCCESSFUL BIDDER OS #1437
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1438
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEV 4/5
Force Majeure
0.580 Bcf/d
Until Further Notice
Tennessee Gas Pipeline declared a force majeure on October 2, 2026 between valve sections 313A-403 to 313A-404 on the HC Line just south of Avoca, New York, following discovery of an anomaly requiring immediate repair. This is Revision 3, issued as a reminder that repair work is scheduled to begin on October 6, 2026, with primary firm capacity at MLV 313 HC Zone 4 End (Segment 399 FH) at risk for up to 0.580 Bcf/d; meters 412803 (TGP Gravel Run) and 421068 (TGP Wyckoff Storage) are being physically shut in for the duration of work, with all secondary receipts and deliveries restricted. No restoration timeline has been provided.
TGP HC Line force majeure threatens up to 0.580 Bcf/d of primary firm capacity at MLV 313 Zone 4 End with no restoration timeline; expect bullish pressure on Tennessee Zone 4-300 and Zone 6 New England basis as Appalachian corridor flows through this segment are curtailed, with Wyckoff Storage shut in compounding supply tightness for downstream Northeast markets.
Reroute: Limited: Transco is the primary competing pipeline for Northeast deliveries, and while it serves overlapping markets, TGP's HC Line serves specific Appalachian Zone 4 segments with limited bypass; partial reroute via Transco and TETCO is possible but unlikely to fully offset 0.580 Bcf/d of primary firm curtailment given current system loadings.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 399FH(HC) 10-6 REM
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 490FH EFF 10-6
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PA STORAGE INJ LIMITATIONS EFF 10-7-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 399FH (HC) EFF 10-6
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEV 4/5
Force Majeure
0.580 Bcf/d
Until Further Notice
Tennessee Gas Pipeline has declared a Force Majeure between valve sections 313A-403 and 313A-404 on the HC Line just south of Avoca, New York, effective October 6, 2026 starting with the Timely Cycle. An anomaly requiring immediate repair was discovered; repair work begins October 6 with no stated end date. Up to 0.580 Bcf/d of Primary In the Path capacity at MLV 313 HC Zone 4 End (Segment 399 FH) is at risk, and meters 412803 (TGP Gravel Run) and 421068 (TGP Wyckoff Storage) will be physically shut in for the duration.
TGP HC Line force majeure removes up to 0.580 Bcf/d of Zone 4 primary firm capacity effective Oct 6 with no restoration timeline; expect bullish pressure on Tennessee Zone 4 and Zone 6 Northeast/New England basis with Wyckoff Storage shut in compounding supply tightness into the region.
Reroute: Limited: Transco is the primary competing Northeast pipeline and serves overlapping Zone 4/6 markets, but TGP and Transco together are the two dominant Northeast corridors, so a TGP constraint of this size cannot be fully offset without knowing Transco's available capacity; no same-corridor single alternative exists for direct HC Line Zone 4 deliveries north of the constraint point.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Not scored -- external_id 'TGP-404624' shares its numeric ID and exact title with 'MOJD-404624' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.
Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1437
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
INTERRUPTION OF ISMA EFF 9-30-26 REM
SEV 1/5
Informational
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 1/5
Informational
Not scored -- external_id 'TGP-404616' shares its numeric ID and exact title with 'SNGD-404616' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.
Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
INTERRUPTION OF ISMA EFF 9-30-26 REM
SEV 1/5
Informational
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRITIONS FOR 09-29-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
INTERRUPTION OF ISMA EFF 9-30-26 REM
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ELLISBURG & HARRISON SEC REC RESTR 9-29
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 563 1A RESOLVED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 313A-403 to MLV 313A-404: Anomaly Re
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS 219 EFFECTIVE 9-26-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Not scored -- external_id 'TGP-404461' shares its numeric ID and exact title with 'SNGD-404461' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.
Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 409A-101 to MLV 409A-103 Pig Runs
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT SIP RESTRICTION SEGMENT 492 FH 9-24
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO DEL INCREASESCOASTAL BEND ID2 9-22-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
GAS QUALITY ISSUE AT CALEDONIA UPDATE 2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG TODAY 9-22
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENTREPAIR MLV 258-2TO259-2 RESOLVED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
Sta 310 Unit 1A Waterwash
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY C1 DS 219 EFF 9-19 LIFTED 9-21
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
GAS QUALITY ISSUE AT CALEDONIA UUPDATE
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
INTERRUPTION OF ISMA EFF 9-30-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAITENANCE MTG 9-22-2026 REM
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS AT GRAVEL RUN LIFTED 9-16
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJ MLV313A-403 TO 313A-404 LIFTED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP RESTRICTIONS SEG 114 BH 9-16
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT SEC RESTR AT GRAVEL RUN EFF 9-16
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR SEG 399FH (HC) EFF 9-16
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEV 4/5
Force Majeure
0.590 Bcf/d
Until Further Notice
4 Days
Tennessee Gas Pipeline has declared a force majeure on the HC Line between valve sections 313A-403 and 313A-404, just south of Avoca, New York, effective September 16, 2026. An anomaly requiring immediate repair was discovered, with TGP personnel on site and repair work estimated to last approximately 4 days. The event threatens up to 0.590 Bcf/d of Primary In the Path capacity at MLV 313 HC Zone 4 End (Segment 399 FH), with impact possible as early as the Timely Cycle for Gas Day September 16.
TGP force majeure on the HC Line near Avoca, NY threatens up to 0.590 Bcf/d of Zone 4 primary firm capacity starting September 16 for an estimated 4 days; expect bullish pressure on Tennessee Zone 4-300 leg basis (most recently -1.440 vs HH) and downstream Algonquin Citygate and New England basis as Appalachian/Northeast supply tightens with limited reroute via Transco.
Reroute: Limited: Transco is the primary competing pipeline for Northeast deliveries from this corridor, but Transco Zone 5 and Northeast segments frequently run near capacity; TGP and Transco together dominate this market, so a 0.590 Bcf/d Zone 4 firm curtailment has limited practical reroute relief for affected Northeast shippers.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 409-1 to MLV 406-1 Spike Test
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 542 3A RESOLVED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 9-22-2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
GAS QUALITY ISSUE AT CALEDONIA 9-7-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS219 EFF 9-5 LIFTED 9-8
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR STA 563 1A EFF 8-28-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS219 EFF 8-29 LIFTED 8-31
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SUCCESSFUL BIDDER - OS #1436
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MASTORAGE INJECTION LIMITATIONS EFF 8-27
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE AT STA 542 RESOLVED 8-27
SEV 1/5
lifted ✓
Restoration
2 Days
Tennessee Gas Pipeline has resolved the force majeure declared at Station 542 near DeKalb, Mississippi on August 25, 2026 (Notice #403735). Unit 1 repairs are complete and the station is returning to normal operations. Full nominations pathed through STA 542 (Segment 539 BH) will be scheduled up to capacity effective Timely Cycle for the gas day of August 27, 2026. This is the final update on the event.
STA 542 force majeure resolved; full capacity restoration on TGP Segment 539 BH effective August 27 timely cycle removes the prior supply constraint, with Tennessee Zone 4-300 leg basis most recently at -1.290 vs Henry Hub -- no new directional signal as the disruption is over.
Reroute: N/A -- event is resolved; reroute assessment no longer applicable.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 114BH & 539BH EFF 8-27-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
BH FUEL OVERRIDE PATHS EFF 9-1-26 REM
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1436
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEV 4/5
Force Majeure
0.280 Bcf/d
Until Further Notice
Tennessee Gas Pipeline has declared a Force Majeure at Station 542 near DeKalb, Mississippi, effective August 25, 2026 and until further notice, after discovering a failure requiring immediate repairs on Unit 1. Units 2 and 3 at the same station have been out of service since March and April 2026 respectively, meaning all three compressor units are now offline simultaneously. Tennessee estimates the capacity impact at up to 0.280 Bcf/d, with Primary In the Path nominations on Segment 539 BH at risk of curtailment as early as the Timely Cycle for August 26, 2026.
TGP force majeure at STA 542 removes up to 0.280 Bcf/d of northbound capacity on Segment 539 BH; with all three compressor units now offline and no restoration timeline, expect bullish pressure on Tennessee Zone 4/500 Leg basis vs Henry Hub -- Tennessee Zone 4-300 leg was already trading at a -1.360 basis vs HH as of 2026-08-24 and the loss of primary firm capacity eligibility beginning August 26 Timely Cycle could drive further widening in Southeast and downstream Northeast zones.
Reroute: Moderate: Southern Natural Gas (not live-monitored) and Gulf South serve overlapping Gulf Coast-to-Southeast corridors and may absorb some displaced volumes, though SNG real-time capacity is unverified and neither pipe fully replicates TGP's northbound reach into the Northeast.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 114BH & 539BH EFF 8-26-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS219 EFF 8-22 LIFTED 8-24
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 5-2 to MLV 1-2D Pig Run
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG UPDATE 8-18
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 187BH & 114BH EFF 8-18 REM
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 187BH & 114BH EFF 8-18-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT SECONDARY DELIVERY RESTR REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 8-13-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT SOP RESTR SNG LEASE EFF 8-13-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS245 LIFTED EFF 8-12-2026
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 264 RESOLVED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE MTG 8-18
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCEMAJEURE AT STA 542 EFF 8-4 RESOLVED
SEV 2/5
lifted ✓
Restoration
3 Days
Tennessee Gas Pipeline has resolved the Force Majeure declared on August 4, 2026 at Station 542 near DeKalb, Mississippi, where Unit 1 required emergency repairs. Full nominations will be scheduled up to capacity through STA 542 (Segment 539 BH) effective Intraday Cycle 1 on August 7, 2026. This is the final update on the event, which lasted approximately 3 days.
TGP STA 542 force majeure resolved -- full capacity restored through Segment 539 BH effective August 7 IC1, removing any Southeast supply tightness that had been associated with this 3-day outage; no new trading signal.
Reroute: N/A -- constraint resolved. During the outage, Transco (monitored) and SNG/EGT (monitored) would have provided partial Southeast alternatives, though TGP is one of two dominant Gulf Coast-to-Northeast pipelines.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 187BH & 539BH EFF 8-7-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 187BH & 539BH EFF 8-5-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 EFF 8-6-26 REVISED
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS 245 EFF 8-6-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCEMAJEURE AT STA 542 EFFECTIVE 8-4-26
SEV 4/5
Force Majeure
0.280 Bcf/d
Until Further Notice
Tennessee Gas Pipeline has declared a Force Majeure at Station 542 near DeKalb, Mississippi effective August 4, 2026, after discovering an issue with Unit 1 requiring immediate repairs. Units 2 and 3 at the same station have been out of service since late March and early April 2026 respectively, meaning all three units at STA 542 are now offline. The estimated capacity impact is up to 280,000 Dth/day (0.280 Bcf/d), with Primary In the Path nominations through Segment 539 BH at risk beginning Timely Cycle for August 5, and the event is open-ended with no restoration timeline.
TGP force majeure at STA 542 with all three compressor units offline removes up to 0.280 Bcf/d of capacity through the Mississippi corridor; with no restoration timeline and primary firm service at risk starting August 5, expect bullish pressure on Southeast basis points (Tennessee Zone 4, Transco Zone 4) versus Henry Hub.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping Gulf Coast-to-Southeast corridors, but both are significantly smaller than TGP in this segment and may lack spare capacity to fully absorb 0.280 Bcf/d of displaced volumes.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 264 EFF 7-31-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
BH FUEL OVERRIDE PATHS EFF 9-1-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE 538-2 - 539-2 RESOLVED
SEV 2/5
lifted ✓
Restoration
1 Days
Tennessee Gas Pipeline has resolved the force majeure event on Line 2 between MLV 538-2 and 539-2 near Heidelberg, Mississippi, originally declared July 23, 2026 (Notice #402947). Repairs are complete and the segment has returned to normal operations. Nominations will be accepted up to capacity through MLV 539 (Segment 534 BH) and at the Leaf Jasper County Meter (412789) until further notice.
TGP Line 2 force majeure near Heidelberg, MS is resolved effective July 27; restoration of southbound Gulf Coast throughput is mildly bullish for Southeast markets and removes any TGP-driven basis widening at Transco Zone 4 that may have developed since the July 23 outage.
Reroute: High: event is resolved; reroute assessment is moot as full capacity has been restored on TGP Line 2 near Heidelberg, MS.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE 538-2 - 539-2 UPDATE #3
SEV 3/5
Force Majeure
Until Further Notice
1 Days
Tennessee Gas Pipeline declared force majeure on Line 2 between valve sections 538-2 and 539-2 near Heidelberg, Mississippi effective July 23, 2026. This is Update #3 and represents a near-restoration notice: TGP anticipates completing final repairs by July 26, 2026, with full Primary In the Path service at MLV 539 (Segment 534 BH) expected to resume at Timely Cycle for Gas Day July 27, 2026. The Leaf Jasper County Meter (412789) will also return to full meter capacity nominations effective the same cycle.
TGP Line 2 force majeure near Heidelberg, MS is on the verge of full restoration effective July 27 Timely Cycle -- any bearish Southeast basis pressure from the original July 23 outage should reverse as supply restrictions lift on this segment.
Reroute: Moderate: during the outage period, Transco (monitored) and Southern Natural Gas (SNG/EGT, monitored) serve overlapping Gulf Coast and Southeast markets and likely absorbed displaced volumes; restoration removes the need for reroute.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTR 187BH & 534BH EFF 7-27-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE 538-2 - 539-2 UPDATE #2
SEV 1/5
Informational
Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.
Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE MTG TODAY
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE 113-2 TO 114-2 EFF 7-22-26
SEV 4/5
Force Majeure
Until Further Notice
Tennessee Gas Pipeline has declared a Force Majeure on Line 2 between MLV 113-2 and MLV 114-2 (Broad Run Lateral) in Boyd County, Kentucky near Catlettsburg, effective July 22, 2026, until further notice. The FM is triggered by a PHMSA Corrective Action Order (CAO) following an emergent repair that began July 8, 2026, which restricts operating pressures on Line 2 from Sta. 110 (Morehead, KY) to Sta. 114 (Catlettsburg, KY). As a result, nominations at Big Sandy Glancy Fork PIN 412742 will be reduced to zero, with potential for additional segment restrictions as nearby scheduled maintenance concludes.
TGP force majeure on Line 2 Appalachian segment (Sta. 110-114, KY) reduces Big Sandy Glancy Fork nominations to zero until further notice, tightening Appalachian southbound/downstream capacity and supporting bullish pressure at Transco Zone 4 Southeast and Dominion South basis vs Henry Hub.
Reroute: Moderate: Transco and Columbia Gas Transmission (TCO) serve overlapping Appalachian and Southeast corridors, but TCO and TETCO M2 capacity availability will determine how much of the stranded Big Sandy volume can be rerouted; additional TGP segment restrictions flagged as possible if nearby maintenance concludes, which could further limit reroute flexibility.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED STA 1-STA 40 EFF 7-20
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CRITICAL DAY 1 EFFECTIVE 7-18
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG REMINDER 7-21
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
Sta 245-1 to MLV 249-1 Pig Run
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MLV 253-1 to MLV 253-1R Anomaly Remediat
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RES OF CAP FOR FUTURE EXP. - UPDATE
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FIRM CAPACITY - EXPANSION OS #1435
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 DS 245 EFF 7-14-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 EFF 7-11-26 LIFTED 7-13-26
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 EFFECTIVE 7-11-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 7-21-2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR 559-2A TO 560-2 EFF 7-7
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTRICTION SEG187BH EFF 7-7 REM
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED EFFECTIVE 7-5-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 DOWNGRADED EFFECTIVE 7-1-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT PIP RESTRICTION SEG 187BH EFF 7-7-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EXPANDED EFFECTIVE 7-1-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 FOR 500 LINE EFFECTIVE 6-30-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEGMENT 26-GC #3 ML-ILI TOOL RUNS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OUTAGE IMPACT REPORT - 5-28-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
IMB MANAGEMENT - 3 BEAR (LOC 53667)
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEG 11-AM #2 M/L(CS 103/104) PIPE INT
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE - REMEDIATION - CS341-UPD2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PHMSA MEGA RULE-CS184/154 PLM-UPD3
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OUTAGE IMPACT REPORT - 6-4-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEGMENT 2-CS801-UNIT MAINT
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OUTAGE IMPACT REPORT 6-11-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEGMENT 25 - CS 302 - STA MAINT
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEGMENT 26 - ILI TOOL RUNS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE-REMEDIATION-CS34 -UP3
SEV 1/5
Informational
TGP Notice ID TGP-47017 titled 'FORCE MAJEURE-REMEDIATION-CS34-UP3' was posted but contains no notice text -- the system returned an empty body. Despite the force majeure label in the title, no operational details, capacity figures, affected locations, or timelines can be extracted. Cannot assess market impact without substantive notice content.
No actionable trading signal -- notice body is empty and no capacity, location, or duration data is available despite the force majeure title; monitor TGP postings for a populated revision before taking a position.
Reroute: Cannot assess reroute potential -- no affected segment, location, or capacity information is available in the notice text.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE-REMEDIATION-CS341-UP4
SEV 1/5
Informational
TGP Critical Notice TGP-47024 titled FORCE MAJEURE-REMEDIATION-CS341-UP4 was posted on 2026-06-25, but the notice body returned no text -- the system returned 'There was no text returned for this notice.' No operational details, capacity figures, locations, or duration are available. The notice title suggests a force majeure remediation event at Compressor Station 341, Unit 4, but no confirmation is possible from the available data.
No actionable market signal -- notice body is empty and no capacity, location, or duration data is available; monitor TGP for a subsequent revision with substantive text before trading on this title.
Reroute: Cannot assess -- no operational details provided in the notice body. If CS341 force majeure is confirmed in a subsequent revision, reroute options depend on segment location; TGP and Transco serve overlapping Gulf Coast-to-Northeast corridors with limited reroute capacity for Northeast deliveries.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OUTAGE IMPACT REPORT 6-18-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEGMENT 26-GC #3 ML-ILI TOOL RUNS - UPD1
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
FORCE MAJEURE - REMEDIATION - CS341-UPD5
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OUTAGE IMPACT REPORT - 6-18-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SEG 25 - STATION MAINT - CS 343 - UPD2
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED 6-24-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SUCCESSFUL BIDDER - OS #1433
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
SUCCESSFUL BIDDER - OS #1432
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFFECTIVE 6-20-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY - OS #1433 - REV
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MEETING TODAY
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP RESTRICTIONS AT 204 EFF 6-17
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
Request for Proposal
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1432
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
AVAILABLE FIRM CAPACITY OS #1433
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTR SEG 204 & SEG 187 EFF 6-12-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
Sta 261 Agawam Unit Suction Valve
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTR SEG 204 & SEG 187 UPDATE 1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 6-16-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR S CHURCH LAT EFF 6-10
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 32 EFFECTIVE 6-8
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT MLV 533-2 - 534-2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 LIFTED EFFECTIVE 6-4-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 5-16-2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED FOR Z 4,5&6 EFF 6-3-26
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFER REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR MLV 4-1 TO 8-1 EFF 6-2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EXPANDED EFFECTIVE 6-1-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFFECTIVE 5-30-26 REVISED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 FOR ZONES 4,5&6 EFF 5-30-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTR SEG 204 & SEG 187 REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED 5-27-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTR SEG 204 & SEG 187 REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED 5-27-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTR SEG 204 & SEG 187 EFF 5-27-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFFECTIVE 5-23-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE TODAY 5-19
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE 5-19-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTRICTION SEG 187 BH 5-19 REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
PIP RESTRICTION SEGMENT 187 BH 5-19-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE UPDATE 5-19-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED EFFECTIVE 5-13-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
ANT SECONDARY DELIVERY RESTRICTIONS 5-13
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 DOWNGRADED EFFECTIVE 5-12-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-09-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-06-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-06-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-06-2026 ID3
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EXPANDED EFFECTIVE 5-8-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-07-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-07-2026 ID2
SEV 3/5
Operational Alert
1.251 Bcf/d
Until Further Notice
1 Days
Tennessee Gas Pipeline has issued a Critical Day OFO for over-deliveries and declared segment restrictions across nine segments (STA 1, 307, MLV 314 East, STA 315, 317, 321, 325, Z5 HC North, and STA 245) effective Intraday 2 cycle (18:00) on May 7, 2026, expiring May 8 at 09:00. Restrictions range from 67% to 100% of SOP increases, driven by nominations in excess of operational capacity and scheduled maintenance on multiple segments. Combined restricted volume across all named segments totals approximately 1.251 Bcf/d in Dth terms.
TGP Critical Day OFO with ~1.251 Bcf/d of aggregate segment SOP restrictions active through May 8 morning creates intraday tightness on the northbound corridor; expect mild bullish pressure at Transco Zone 5 and Algonquin Citygate basis while Gulf Coast receipt points see modest bearish offset as gas backs up.
Reroute: Limited: Transco is the primary competing pipeline for Northeast and Mid-Atlantic deliveries, but TGP and Transco are both heavily subscribed on peak days; partial reroute via Transco is possible but unlikely to fully offset intraday TGP segment restrictions.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-05-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFFECTIVE 5-2-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-01-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-02-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-02-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-02-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-03-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-03-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-04-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-04-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-04-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EXPANDED EFFECTIVE 5-6-2026
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP SUMMER MAINTENANCE MTG 5-19-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 05-05-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-28-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-28-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-29-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
MONTHLY STORAGE TRANSFERS REMINDER
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-30-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-30-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-30-2026 ID3
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-25-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFF 4-25-2026 LIFTED 4-27-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-24-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-24-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-23-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-23-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 40 1D EFF 4-22-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-22-2026 ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-22-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-22-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP FIRST SUMMER MAINTENANCE MTG TODAY
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 321 1C EFF 4-21
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-16-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 LIFTED EFFECTIE 4-20-2026
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-18-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-18-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-18-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP FIRST SUMMER MAINTENANCE MTG REM
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-04-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-05-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-05-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-05-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-06-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-07-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-07-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-15-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP FIRST SUMMER MAINTENANCE MTG REM
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-03-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-04-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-13-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-13-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-14-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-02-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-03-2026 EC
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-02-2026 ID3
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-03-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-03-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-12-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-12-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-10-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-11-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-08-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP FIRST SUMMER MAINTENANCE MTG 4-21-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-09-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-09-2026 ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO CD1 EFF 4-11-2026 - EXPANDED 4-13-26
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
RESTRICTIONS FOR 04-10-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
About Tennessee Gas Pipeline
A long-haul system moving Gulf Coast and Marcellus/Utica gas north and east, with a growing share of flows now running south from Appalachia toward Gulf Coast demand and LNG.
Operated by Kinder Morgan Runs The Texas and Louisiana Gulf Coast to New York and New England, through Appalachia Trading points Tennessee Zone 0, Zone 1 (500L, 800L), Zone 4 Marcellus, Zone 6 Mapped facilities Station 542 (Dekalb)
Tennessee Gas Pipeline Station 542 (Dekalb)
Line from EIA pipeline data; dots are facilities named in this pipeline’s notices (HIFLD locations). Dashed lines are schematic.
New to pipeline notices? How to read a notice ·
Glossary ·
Get alerts for Tennessee Gas Pipeline ·
Capacity offline on all pipelines